Water Filling Machine Export Packing: Shipment Checklist

Separate successful machine FAT from permission to ship. Before release, check the machine identity, remaining deviations, preservation, packing register and transport handover. Packing and delivery commitments must be confirmed for the specific route and contract.

01

Create a package-level register

Request package number, contents, documented dimensions and weights, handling information and destination marks. Tie loose parts, change tooling, spares and documents to a package so they can be located on arrival.

  • Machine/serial and assembly references
  • Crate or package identifier
  • Dimensions and verified weight basis
  • Contents and destination marks
02

Agree preservation for the route

Ask the supplier and logistics provider to define protection, moisture control, restraint and storage assumptions for the actual journey. Require appropriately qualified parties to plan lifting and loading from the supplied data; do not infer lifting points from photographs.

  • Supplier packing and handling instructions
  • Transit/storage conditions and duration assumptions
  • Inspection/photo record before package closure
03

Close the pre-shipment evidence gate

Review FAT status, agreed open-item treatment, final drawings, manuals and the packing list. Identify the person authorized to release shipment. A passed operational test does not explain a missing part or unresolved document.

  • Accepted FAT and deviation register
  • Final packing list and equipment identity
  • Required shipping/commercial documents and owners
04

Prepare the arrival check

Agree how the buyer records package condition, shortages and damage on receipt and how issues are escalated. Verify unloading access and storage readiness before dispatch. Responsibility for freight, insurance, customs and local costs must be stated in the actual contract.

  • Receipt inspection and photo plan
  • Unpacking/preservation instructions
  • Claim contact and evidence requirements

Questions and answers

Can the machine ship immediately after FAT?

Only after the agreed release requirements are satisfied, including packing, documents, open items and logistics readiness.

Does the machine price include freight and import costs?

Check the quotation and contract. List freight, insurance, customs, taxes, unloading and local transport responsibility separately.

What photographs are useful before shipment?

Request equipment identification, accessories, package contents, preservation, closed-package marks and loading evidence appropriate to the agreed inspection plan.

Next procurement decision

Make delivery and support responsibilities part of the order.

Define packing, site readiness, installation, training, spares, manuals, warranty and response ownership.

Request delivery and support scope