Confirm access and the approved position
Check the delivery route, unloading area and final placement against the approved machine and shipping drawings. Have qualified site personnel address load capacity, handling and installation arrangements. Record deviations before the equipment arrives.
- Current layout and location datum
- Access and positioning plan
- Required site work and completion owner