Skip to content
Allot Tech · Mr Kcal · English
RFQ Allot TechSupplier selection & quote evidence

Scope normalization

How to Compare Water Filling Machine Supplier Quotations

Do not compare cover-page totals until every offer uses the same reference bottle, accepted-output definition, revision, supply boundary and commercial responsibility.

01

Freeze a common comparison basis

Write one basis at the top of the comparison sheet and reject silent substitutions.

  • RFQ and quotation revision/date
  • Reference bottle and cap revision
  • Accepted output and test basis
  • Destination, trade term and requested services
02

Convert every line into a responsibility state

Use included, optional, excluded, buyer-supplied or open. “Standard scope” and blank cells are not decision states.

  • Main machine and peripheral equipment
  • Utilities, piping, conveyors and controls
  • Change parts, consumables and spares
  • Packing, freight, installation and training
03

Control deviations and assumptions

A bidder deviation should name the affected requirement, supporting document, price or schedule effect, acceptance impact, owner and resolution status.

  • Requirement and bidder response
  • Technical document reference
  • Commercial or schedule consequence
  • Clarification owner and due gate
04

Compare total responsibility, not only equipment subtotal

Record buyer-side costs and unresolved responsibilities beside the quoted amount. Do not manufacture a single landed total when freight, duties or site work remain unknown.

  • Supplier price on stated trade term
  • Known optional and required add-ons
  • Buyer utilities, civil and local labor
  • Open cost, schedule and acceptance exposure

Questions and answers

Why are two water filling machine quotations difficult to compare?

They may use different bottles, output definitions, equipment boundaries, component standards, FAT scope, trade terms and service responsibilities. Normalize those fields before comparing price.

What is often missing from a low-price quotation?

Common omissions include bottle and cap handling, product-water interfaces, change parts, spares, FAT materials and duration, documents, export packing, installation, travel and buyer-side work. Confirm the actual offer rather than assuming an omission.

Should optional items be added to the quoted total?

Only when the project actually requires them. Keep required additions, discretionary options and unresolved items separate so the comparison remains auditable.

Quotation normalization

Use one deviation register across every bidder.

The comparison becomes useful when the buyer can trace why totals differ. Keep the common requirement, bidder response, supporting document, price or schedule consequence, acceptance effect, owner and status in the same row.

Quotation deviation and responsibility register
FieldWhat to recordWhy it changes the decision
Document controlRFQ revision, quote revision, date and valid replacement documentsPrevents comparing superseded scopes
Performance basisBottle/cap revision, setup speed, rated speed and accepted good outputExposes non-equivalent output claims
Scope stateIncluded, optional, excluded, buyer-side or open for every interfaceReveals the real purchase boundary
Deviation impactTechnical reason plus price, schedule and acceptance consequenceMakes trade-offs explicit
Responsibility totalEquipment, required options, services and known buyer-side workAvoids treating subtotal as project cost

Next procurement decision

Put each supplier on the same evidence and scope matrix.

Compare configuration assumptions, interfaces, FAT, documents, delivery and service before ranking price.

Open supplier worksheet