Skip to content
ALLOT TECH · English
RFQ Allot TechMachine selection & quote comparison

Procurement review / evidence before claims

How to Evaluate a Water Filling Machine Supplier

A serious supplier should clarify missing project inputs, expose assumptions and convert the proposal into acceptance criteria before asking the buyer to compare price.

01

Start with a written technical brief

Send every candidate the same product, bottle, cap, output, utility, interface and delivery brief.

  • Reference bottle for capacity
  • Exact machine boundary
  • Bottle and cap compatibility
  • Factory and destination conditions
02

Review the technical proposal

Look for confirmed specifications and visible assumptions rather than broad claims.

  • Product-contact materials
  • Electrical components and allowed alternatives
  • Infeed/outfeed and control interfaces
  • Changeover and included formats
03

Review acceptance and evidence

Ask what will be available before shipment and how results will be recorded.

  • FAT items and test conditions
  • Manuals, drawings and parts list
  • Spare parts and consumables
  • Packing and shipment evidence
04

Review responsibility after order

Clarify who coordinates installation, commissioning, training, warranty and technical response.

  • Buyer site-readiness duties
  • Supplier or third-party engineer scope
  • Travel and local cost responsibility
  • Response and spare-parts procedure

Quote basis

Keep these four inputs identical across supplier enquiries.

Final equipment, performance, utilities and responsibilities require confirmation in the project-specific technical proposal.

Get a proposal