Before the test
Confirm that the machine and test basis match the approved order.
- Configuration and nameplate
- Reference bottle and cap quantities
- Utilities and product-water test condition
- Approved FAT protocol
Factory acceptance planning
The signed technical agreement should define the final FAT items, test materials, duration, measurement method and acceptance conditions.
Confirm that the machine and test basis match the approved order.
A water test should show more than motion.
Observe controlled response outside steady-state operation.
Record open points before packing.
Final FAT items and acceptance conditions are confirmed in the signed technical agreement.